<body><script type="text/javascript"> function setAttributeOnload(object, attribute, val) { if(window.addEventListener) { window.addEventListener('load', function(){ object[attribute] = val; }, false); } else { window.attachEvent('onload', function(){ object[attribute] = val; }); } } </script> <div id="navbar-iframe-container"></div> <script type="text/javascript" src="https://apis.google.com/js/platform.js"></script> <script type="text/javascript"> gapi.load("gapi.iframes:gapi.iframes.style.bubble", function() { if (gapi.iframes && gapi.iframes.getContext) { gapi.iframes.getContext().openChild({ url: 'https://www.blogger.com/navbar.g?targetBlogID\x3d8322021\x26blogName\x3dshopping+is+the+new+cardio.\x26publishMode\x3dPUBLISH_MODE_BLOGSPOT\x26navbarType\x3dBLACK\x26layoutType\x3dCLASSIC\x26searchRoot\x3dhttps://ilurvetoshop.blogspot.com/search\x26blogLocale\x3den_US\x26v\x3d2\x26homepageUrl\x3dhttp://ilurvetoshop.blogspot.com/\x26vt\x3d-2372673081637013661', where: document.getElementById("navbar-iframe-container"), id: "navbar-iframe", messageHandlersFilter: gapi.iframes.CROSS_ORIGIN_IFRAMES_FILTER, messageHandlers: { 'blogger-ping': function() {} } }); } }); </script>

Friday, March 18, 2005

crazy week..

some issues to think about:


why do i bring (to school everyday) a pencil case with 1 scissors, 1 pen-knife, 1 thumbdrive, 1 ruler, 1 lead, 1 liquid corrector, 1 stapler, 1 mechanical pencil, 2 erasers, 17 markers/highlighters and 17 pens when i only use 1 or 2 of them in the entire day?

same as why do i have to bring a blardy big bag that looks heavy and IS heavy, with lots of things i thought is essential when i only utilise 20% of wat's inside? and consequently ending the day with aching shoulders?



why is it that i am working my ass off for this certain project when the others (ok.. not all) seems to be too assuming that i will handle all technical aspects and subsequently tie up the loose knots?

while i have other projects where i behave like a parasite, i.e. am still doing my part but not necessary up to the group's pace?

proven: what goes around comes around.



why is it that i have been working so hard this week, or so i think but have yet to kill off one single project?

till date: zero outta four projects down.



why am i still lagging behind from day one for all my 5 modules?

this i know: cos i have been a lousy procastinating idert.

24 hours a day is not enough if i need 8 hours of sleep to call it sufficient.

0 Comments:

<< Home